Design

Download Human-Factors Guidance, Intfc Design - Nuclear Reactor Ctl PDF

Read or Download Human-Factors Guidance, Intfc Design - Nuclear Reactor Ctl Rooms - US DOE PDF

Similar design books

Design with Intent: 101 Patterns for Influencing Behaviour through Design

It’s appropriate throughout product, provider, interplay and architectural layout, aimed toward socially and environmentally worthwhile behaviour switch. The styles are drawn from a number of disciplines, and are phrased as questions or provocations to let the toolkit’s use as either a brainstorming device and a advisor for exploring the sector of layout for behaviour swap.

Transient-Induced Latchup in CMOS Integrated Circuits

Content material: bankruptcy 1 advent (pages 1–21): bankruptcy 2 actual Mechanism of TLU lower than the approach? point ESD try (pages 23–45): bankruptcy three part? point dimension for TLU lower than process? point ESD concerns (pages 47–73): bankruptcy four TLU Dependency on energy? Pin Damping Frequency and Damping think about CMOS built-in Circuits (pages 75–93): bankruptcy five TLU in CMOS ICs within the electric quickly temporary try (pages 95–112): bankruptcy 6 technique on Extracting Compact format ideas for Latchup Prevention (pages 113–150): bankruptcy 7 designated format matters for Latchup Prevention (pages 151–168): bankruptcy eight TLU Prevention in strength?

Digital Signal Processing System Design. Lab: VIEW-Based Hybrid Programming

This publication combines textual and graphical programming to shape a hybrid programming strategy, allowing a more desirable technique of construction and examining DSP structures. The hybrid programming process permits using formerly built textual programming suggestions to be built-in into LabVIEW's hugely interactive and visible setting, supplying a better and swifter technique for development DSP platforms.

Additional info for Human-Factors Guidance, Intfc Design - Nuclear Reactor Ctl Rooms - US DOE

Example text

Consoles and panels). • The arrangement of workstations and supporting equipment into facilities such as a main control room, remote shutdown station, local control station, technical support center, and emergency operations facility. 1-7 Introduction • The environmental conditions in which the HSIs are used, including temperature, humidity, ventilation, illumination, and noise. ” In a computer-based control room, secondary tasks include activities such as navigating or accessing information at workstations and arranging various pieces of information on the screen.

As this is an electronic document, these crossreferences are hyperlinked for easy access. Another important feature is the ability to find information of interest (which may be in multiple sections). To support the user in this type of search, a context-sensitive search feature is provided. That is, a desired term can be entered into the document’s search function and the results (displayed on the right-hand side of the screen) show each instance of the desired term along with the surrounding text where that instance occurs (see Figure 1-8).

Functions are allocated to human and system resources. Each function can be broken down into tasks. The tasks are analyzed to identify the alarms, displays, procedures, and controls that will be required for task performance. Task requirements reflect performance demands imposed by the detailed design of the plant. Tasks are arranged into meaningful jobs to be performed by plant personnel. The HSIs, support systems, procedures, and training are designed to best support personnel in performing their tasks.

Download PDF sample

Rated 5.00 of 5 – based on 3 votes